Grid Power SolutionsGRID POWERSOLUTIONS
PLC I/O Field Wiring, Testing & Startup Support

TERMINATIONS · LOOP CHECKS · COMMISSIONING

The field side ready for the controls team.

PLC I/O and control-panel field terminations, point-to-point testing, loop checks, device verification and on-site startup support.
Explore capabilities ↓Discuss a project ↗

OVERVIEW

Grid Power Solutions completes and tests the physical field infrastructure. PLC programming remains with the client’s controls integrator; during commissioning, we provide the on-site hands, eyes and electrical corrections needed to finish efficiently.

FIELD DELIVERABLES

Built, terminated
and ready to test.

  1. 01PLC I/O field terminations
  2. 02Control-panel and terminal-block wiring
  3. 03Point-to-point testing
  4. 04Loop checks and device verification
  5. 05Field wiring corrections
  6. 06On-site controls-integrator support

COMMON APPLICATIONS

Where this scope fits.

New control systemsPlant upgrades and migrationsPackaged equipment integrationShutdowns and commissioning windows

HOW WE EXECUTE

One field partner.
A clear handoff.

  1. 01Confirm I/O drawings and termination points
  2. 02Complete, label and inspect field wiring
  3. 03Test every point with the controls team
  4. 04Resolve field issues during startup

READY TO DISCUSS THE FIELD SCOPE?

Bring us the hard part.

Call 1-888-477-6513 →contactus@gridpowersolut.com →